How it works

Six steps, no surprises

Typical build: 11 to 20 weeks

Fixed quote before anything is cut

  • 01

    The room

    We come to the house and measure it properly, including the things that will cause trouble later: the wall that is out of plumb, the beam nobody mentioned, where the light actually falls in the afternoon.

  • 02

    Drawing

    Plans and elevations, then full-size setting out for anything unusual. If you are working with an architect we draw to their layout and send shop drawings back for marking up.

  • 03

    Timber and metal

    You see the actual boards, not a sample chip, and you choose the hardware finish against them in daylight. Grain is not a finish option. It is most of the design.

  • 04

    Making

    Eleven to twenty weeks depending on the room. Photographs go out every week, including the weeks when nothing visible happened.

  • 05

    Finishing

    Oil or lacquer, cut back by hand between coats over several days. Metalwork is finished in the same building, so the two arrive on site already matched.

  • 06

    Fitting

    Our own team installs. Scribing an old wall takes as long as it takes, and we hand the room back clean.